Date: Tue, 24 Jul 2007 03:06:08 -0400 From: Joe Nugent Subject: Mega Lottery #13 Beginnings If you are not 18 and/or object to male to male sex leave now. The security office in cabin 4 was set up the main room was full of monitors and a computer to record all 32 screens 24/7 and could store one full week on each disk. Chick and Dave worked the day shift and Eric and Frank worked the night one. Alex and Brad were every where helping and fine tuning the system. The bullet proof glass had been installed, all the doors and windows had been wired with alarms as well as having a camera positioned on each. The cooks Tommy and Steve were busy cooking for sixteen now and also prepared meals for the guys in the security detail that worked nights. Those two guys were worth they weight in gold we eat like kings all the time. John and I were glued to Hank it seemed, at first with him trying to find out everything he could on the style house we wanted. It seemed as every time we suggested something it meant more questions as to the size the color how many floors and the size of the rooms and how many. Alex also had his input on the design. He suggested we did out a large share of the top of the mound and out in under ground storage and garages and he also thought a separate section to house a large generator be put under ground and exhausted outside, one large enough the supply power to the entire house. Hank amazed us with his own computer and could show us virtual images of everything we suggested. John and I finally decided on Adobe style, the standard whit walls and red tile roofs. As for the shape you have to imagine a large letter 'H' with the bottom legs curving out to form a half circle. The house was going to be three stories high with each story smaller creating a ten foot covered walkway. The top section of the 'H' would be an atrium with an enclosed swimming pool, with real trees, bushes, flowers and grass to be enjoyed round. Tommy and Steve were asked for input to create a commercial kitchen the could cook for up to a hundred, for large parties. Hank also asked if we wanted any special rooms we told him to include a weight room, sauna, steam room, gym, game room for arcades, a full security room, several offices, every bed room was to be a suite with sitting room and private bath with hot tub and shower. Alex also stated all windows again should be bullet proof and none of them needed to open as the house should have both ac and heat with return air. Hank laughed and said well that should keep me busy for a day or two. Now yet me get a small virtual display set up for you all to see how you like it. When I get it done I will let everyone have a look. The next day John and I just were in everyone's way it seemed we had nothing to do after going non stop. Hank said he seemed never to get a chance to work on the virtual program, with all the interruptions. He informed us he already had contacted a firm to start dredging the lake he figured it would take two weeks working sun-up till sun-down each day 7 days a week with three crews digging. He had found another crew to check the rock formation and see if they could do some blasting on the rock and dirt hill into John's waterfall. He seemed to be at his desk and drafting table from early morning till the wee hours of the night. We all asked him if we could help and he said no that this had been his dream for years and he was fine. The next moring at breakfast John and I told everyone we were going to Nashville for a day or two and relax. Alex made all the arrangements and had Eric and Frank the nights guys in a room next to us for protection. We left by helicopter after lunch. Arrived at the Hotel and checked in and told the front desk not to disturb us and all calls were to go Eric and Frank, we wanted total privacy.